Logo de Rigoberto Paredes Abogados Bolivia - Law Firm Ingles | Español   

INVESTMENT OPPORTUNITIES

Multipurpose Potable Water and Irrigation Program for the Municipalities of Batallas, Pucarani and El Alto

This project has the purpose of contracting for the construction of the project that will benefit several families in the municipalities of Batallas, Pucarani and El Alto. The estimated construction period is 33 calendar months and has a reference price of USD 113,124,913.90. Applications will be received until 04/26/2017.


Pre-investment study Improvement of the integral solid waste management of Trinidad

This call is designed to be carried out in the jurisdiction of the Municipal Government of Trinidad – EMAUT. The reference price is 341’927.59 $ US. The application deadline is 03/27/2017.


Construction road of La Plata (Potosí – Coroma)

The road crosses the jurisdiction of the Municipalities of Potosí, Yocalla, Belén de Urmiri and Uyuni of the Department of Potosí. The present project is divided in two sections to be constructed: Section 1. “PROG. 0 + 000 A PROG. 57 + 590 – Estancia Thola Vinto “for a value of 8’332’608,86 USD, and Section 2.” Estancia Thola Vinto – PROG. 57 + 590 A PROG. 142 + 543.10 “for a value of 7’709’321.35 USD. The application deadline is 03/22/2017.


Construction and Supply of weight and dimension Control Posts, Toll Charges and Control Center, and Study of an Intelligent Transportation System for the Fundamental Road Network

The Contract  consists mainly of: i) the final engineering design; (ii) the construction of works and the supply and installation of systems; and (iii) maintenance of works, installations and systems. An investment of 20’000’000.- USD is estimated. The application deadline is 03/17/2017.


Construction of the double track Puente Chimore – Villa Tunari. Sections: Final Puente Chimore – Prog. 301 + 000 and Prog. 301 + 000 – Villa Tunari (with suspensive condition)

The “Cristal Mayu – Montero” double track forms part of the Fundamental Route F-4 of the country’s main road network and the East-West Corridor of our country, allowing the integration of Pacific and Atlantic ports through Chile and Brazil respectively. It is estimated an investment of   42,191,179.28 USD for Section 1. Final Puente Chimore – Prog. 301 + 000 “, and of  38,610,209.72 USD for Section 2.” Prog. 301 + 000 – Villa Tunari”. The application deadline is 10/03/2017.


Pre-investment technical design study for the construction of the Villazon-Yunchara road

The section to be intervened has several alternatives of the route of the road with an approximate length of 70.00 km, starting in the town of Villazón (Potosí) to the town of Yunchará (Tarija). The alternatives are developed on a flat and ondulated topography. The reference price is 910,000.00 USD. The application deadline is 10/03/2017.


CONSTRUCTION OF THE BRIDGE MINEROS-PIRAI (SANTA CRUZ)

The project involves the design and construction of a bridge of approximately 310 m , crossing the river Pirai. This project aims at domestic and foreign construction companies properly constituted and / or accidental associations. It plans to invest $us 6’702’191.95 – Deadline for applications: 02/16/2016.


CONSTRUCTION OF THE ROAD PORVENIR – PUERTO RICO SECTION IA : PORVENIR – SAN MIGUEL (PANDO)

The main objective of the project is to improve the walkability of the road for all seasons, integrating the populations involved with the rest of Country. It estimates to cover 64.30 km. It plans to invest $us 74’686’369.25 Deadline for applications: 02/23/2016.


CONSTRUCTION OF THE ROAD PORVENIR – PUERTO RICO SECTION IB: SAN MIGUEL – PUERTO RICO (PANDO)

The main objective of the project it is to improve the walkability of the road for all seasons, integrating the populations involved with the rest of the country. It estimates to cover 68.83 km. It plans to invest $us 82’634’395.60. Deadline for applications: 02/18/2016.


CONSTRUCTION OF THE ROAD CARACOLLO – COLQUIRI (ORURO – LA PAZ)

The road has 35.59 km long and links the town of Caracollo with Colquiri, an important mining center . It plans to invest $us 35’289’268.66. Deadline for applications: 19/02/2016.


IMPROVEMENT WORKS AND REHABILITATION OF THE ROAD RIO SECO – DESAGUADERO (LA PAZ)

The section to intervene has a length of 95.41 km and it consists of two lanes. It is estimated to invest $us 8’787’313.79. Deadline for applications: 02/17/2016.


ACQUISITION OF PHARMACEUTICAL PRODUCTS AND MEDICINES (LA PAZ)

Salud a national health fund ask for to legal enterprises from the pharmaceutical sector to submit proposals for the supplying of around 505 items. It plans to invest $us 28’431’551.55. Deadline for applications: 01/11/2016.


   Return   


Phones: +591 (2)2-444354
              +591 (2)2-441461
              +591 (3)3-434341
Fax:      +591 (2)2-441461
Internacional +9546361690
icono whatsapp Cel: +591 77773344    +591 60655559
icono skype Call
abogados@rigobertoparedes.com


icono facebook   icono linkendin   icono twitter   icono google plus   icono blogspot   icono youtube   icono instagram

¿DESEA PAGAR SERVICIOS ONLINE?
WOULD YOU PAY ONLINE SOME SERVICES?

icono pagos en linea