This project has the purpose of contracting for the construction of the project that will benefit several families in the municipalities of Batallas, Pucarani and El Alto. The estimated construction period is 33 calendar months and has a reference price of USD 113,124,913.90. Applications will be received until 04/26/2017.
This call is designed to be carried out in the jurisdiction of the Municipal Government of Trinidad – EMAUT. The reference price is 341’927.59 $ US. The application deadline is 03/27/2017.
The road crosses the jurisdiction of the Municipalities of Potosí, Yocalla, Belén de Urmiri and Uyuni of the Department of Potosí. The present project is divided in two sections to be constructed: Section 1. “PROG. 0 + 000 A PROG. 57 + 590 – Estancia Thola Vinto “for a value of 8’332’608,86 USD, and Section 2.” Estancia Thola Vinto – PROG. 57 + 590 A PROG. 142 + 543.10 “for a value of 7’709’321.35 USD. The application deadline is 03/22/2017.
The Contract consists mainly of: i) the final engineering design; (ii) the construction of works and the supply and installation of systems; and (iii) maintenance of works, installations and systems. An investment of 20’000’000.- USD is estimated. The application deadline is 03/17/2017.
The “Cristal Mayu – Montero” double track forms part of the Fundamental Route F-4 of the country’s main road network and the East-West Corridor of our country, allowing the integration of Pacific and Atlantic ports through Chile and Brazil respectively. It is estimated an investment of 42,191,179.28 USD for Section 1. Final Puente Chimore – Prog. 301 + 000 “, and of 38,610,209.72 USD for Section 2.” Prog. 301 + 000 – Villa Tunari”. The application deadline is 10/03/2017.
The section to be intervened has several alternatives of the route of the road with an approximate length of 70.00 km, starting in the town of Villazón (Potosí) to the town of Yunchará (Tarija). The alternatives are developed on a flat and ondulated topography. The reference price is 910,000.00 USD. The application deadline is 10/03/2017.
The project involves the design and construction of a bridge of approximately 310 m , crossing the river Pirai. This project aims at domestic and foreign construction companies properly constituted and / or accidental associations. It plans to invest $us 6’702’191.95 – Deadline for applications: 02/16/2016.
The main objective of the project is to improve the walkability of the road for all seasons, integrating the populations involved with the rest of Country. It estimates to cover 64.30 km. It plans to invest $us 74’686’369.25 Deadline for applications: 02/23/2016.
The main objective of the project it is to improve the walkability of the road for all seasons, integrating the populations involved with the rest of the country. It estimates to cover 68.83 km. It plans to invest $us 82’634’395.60. Deadline for applications: 02/18/2016.
The road has 35.59 km long and links the town of Caracollo with Colquiri, an important mining center . It plans to invest $us 35’289’268.66. Deadline for applications: 19/02/2016.
The section to intervene has a length of 95.41 km and it consists of two lanes. It is estimated to invest $us 8’787’313.79. Deadline for applications: 02/17/2016.
Salud a national health fund ask for to legal enterprises from the pharmaceutical sector to submit proposals for the supplying of around 505 items. It plans to invest $us 28’431’551.55. Deadline for applications: 01/11/2016.