The section to intervene has a length of 95.41 km and it consists of two lanes. It is estimated to invest $us 8’787’313.79. Deadline for applications: 02/17/2016.
The section to intervene has a length of 95.41 km and it consists of two lanes. It is estimated to invest $us 8’787’313.79. Deadline for applications: 02/17/2016.